The Hacklemans    |     Home
                                                  
Progress II
 
Parking is getting tight
Air conditioning installers, masons, plumbers and painters converge.
Cowgirl Isabel helps Marie arrange tiles
Cowgirl Isabel helps Marie arrange tiles.
Rodney on his way down after installation of Pewabic tile near peak
Rodney lowers the boom after installation of Pewabic tile at peak.
Safety first as Ian prepares to use a sharp scrapping tool
'Safety first' as Ian heads down ramp to use a sharp scrapping tool on the radiator project underway in garage.
Isabel and Courtland get the old radiator ready for a new coat of paint while Mom gives a hand
Isabel and Courtland get the old radiator ready for a new coat of paint while Mom gives a hand.
Beautiful, shining white radiator, ready for another heating season
The payoff is a beautiful, shining white radiator, ready for another heating season.
Chris inspects pergola adjustments
Chris inspects cedar pergola adjustments.
Ken Bunyak solders copper panels together for hip roof.
Wire routing, bathroom plumbing, and A/C supply lines in ceiling of kitchen and butler's pantry.
Right, Marie inscribes Bible verse behind breakfast nook counter.
Marie inscribes Bible verse behind breakfast nook counter
Copper roof and flashing over new kitchen window ready for stucco repair.
Mike attaches pergola pillar wraps
Mike attaches pergola pillar wraps.
One of two decorative brackets under new kitchen window.
One of two decorative brackets under new kitchen window. Thanks, Hugh!

Walkway at basement door area
Stairs and walkway outside relocated basement door.
Panoramic view taken February 10, 2009
Panoramic view as of February 10, 2009. 'Painter' shown, far left.
July 27, 2008
Brick work awaits power washing. Garage doors, floor, driveway and landscaping are still ahead.
Dan prepares to blind nail tongue and groove cedar. Note black tension spring hanger (one of three) visible on right.
Dan and Keith prepare to blind nail tongue-and-groove cedar. Note black tension spring hanger (one of three) visible on right.

Keith and Dan smile for the camera
Keith and Dan smile for the camera.
Dan and Keith install the top tongue and groove panel
Dan and Keith align top tongue-and-groove panel.

Dan checks corner of archway for tight fit
After header trim widened, Dan checks corner of archway for tight fit.
Back to Top of Page