Progress IV
|
In a dark basement, Frank Mikolajczyk starts to rewire the main circuit panel January 6
|
Bill wires kitchen outlets May 20
|
|
|
Pat Trombley replacing and painting dormer siding.
At left, plumber Harold Lloyd Clauson (right) with assistant.
|
Cliff Maschke delivers gutter to rooftop
Sarnia Cabinets shares driveway with gutter installers. Homeowner steadies trash can.
|
Cliff and team install garage gutters
|
Ken Bunyak mounts collector and down spout
|
Marie shows off sink and broad new window sill. Dangling wires beckon the electrician.
|
Carol sees spice rack (top) will be handy when range is installed next to pantry. Marie demonstrates pullout below.
|
Richard Holton installs fridge, while Rob on ladder, far right, works on window trim. Painter, yellow hat, observes.
|
It's going to be sooo great to have a real kitchen after 16 months of basement living!
|
Trial run in new kitchen!
|
Kitchen sports new cabinets and Beth sports new medical outfit (compactor in middle of floor awaiting installation).
|
New hand rail extends a 'welcome' as backdoor visitors approach.
|
|
Above, rear of garage also gets a makeover: new door, entrance light, stoop, and walkway.
Left, lights add finishing touch to new garage face.
|
Porch railing includes fleur-de-lis motif in wrought iron.
|
Above, new stairs in exposed aggregate blend with existing terrace.
Right, limestone sills and exposed aggregate add warmth to entrance.
|
|
Finally, mock hinges and handles contribute to the 'barn door' illusion
|